Vejret Dramin

104 m, Płońsk County
I dag, 02:00
let regn
Nedbør: 90 %
Tordenvejr: 30 %
16°
  • 02:00
    moderat regn
    4 bft (25 km/h)
    16°
    90%
    2.0 l
  • 05:00
    let regn
    16°
    90%
    2.0 l
  • 08:00
    let regn
    4 bft (20 km/h)
    16°
    90%
    1.0 l
  • 11:00
    let regn
    18°
    90%
    1.0 l
  • 14:00
    let regn
    4 bft (25 km/h)
    18°
    85%
    0.5 l
  • 17:00
    let regn
    4 bft (20 km/h)
    18°
    85%
    1.0 l
  • 20:00
    let regn
    4 bft (25 km/h)
    16°
    80%
    0.4 l
  • 23:00
    moderat regn
    4 bft (25 km/h)
    16°
    85%
    2.0 l
  • 02:00
    presentation/weather.symbol.description.b1r1
    4 bft (20 km/h)
    14°
    80%
    1.0 l

9-dages vejrudsigt

I dag
20°C
14°C
-
90%
9l
-
2.700m
40%
V 4
Morgen
20°C
13°C
-
60%
1l
8h
1.800m
-
V 5
Torsdag
21°C
12°C
-
-
-
8h
2.100m
-
NV 4
Fredag
22°C
12°C
-
50%
0,9l
9h
2.000m
20%
NV 4
Lørdag
24°C
12°C
-
50%
1l
8h
2.400m
30%
NV 3
Søndag
26°C
14°C
-
-
-
9h
2.800m
10%
NV 3
Man, 13.
25°C
15°C
-
-
-
1h
3.000m
20%
NV 3
Tir, 14.
25°C
15°C
-
-
-
3h
3.300m
30%
NV 4
Ons, 15.
26°C
15°C
-
-
-
7h
3.100m
20%
NV 3
Prognose fra 02:01 (lokal tid)
100m
Frisk sne
Sandsynlighed for nedbør
Nedbør (l/m²)
Sol
Snelinje
Tordenvejr
Vind
Åben regnradar
Regn
Meget stærk
Stærk
Moderat
Lys
Overskyet
Sne
Stærk
Moderat
Lys
Vejr- og regnradar

Vejr- og regnradar

Vejr- og regnradar
For at dit udendørseventyr ikke skal gå i vasken - pålidelige vejrudsigter, temperaturprognoser og nedbørskort for over 15.000 steder.

Gå ikke glip af tilbud og inspiration til din næste ferie

Tilmeld dig nyhedsbrevet
Fejl
Der er opstået en fejl. Prøv venligst igen.
Tak for din tilmelding

Din e-mailadresse er blevet tilføjet til mailinglisten.

bergfex